About this agriculture scheme

With a view to enabling an area-based development approach, a new scheme Pradhan Mantri Adarsh Gram Yojana (PMAGY) was launched during 2009-10. The Scheme aims at the integrated development of Scheduled Castes majority villages.

With a view to enabling an area-based development approach, a new scheme Pradhan Mantri Adarsh Gram Yojana (PMAGY) was launched during 2009-10. The Scheme aims at integrated development of Scheduled Castes majority villages.

The principal objective of PMAGY is the integrated development of SC majority Villages:

(a) Primarily through convergent implementation of the relevant Central and State/UT Government Schemes; and

(b) By taking up identified activities, which do not get covered under the existing Central and State Government Schemes, through ‘Gap-filling’ funds provided as Central Assistance to the extent of Rs. 20,00,000/- per village.

The implementation of the Scheme was started on Pilot basis in 2009-10 and a total of 1000 villages was selected from 05 States namely Tamil Nadu (225), Rajasthan (225), Bihar (225), Himachal Pradesh (225) and Assam (100) were selected for this phase. All these 1000 villages have so far been declared as ‘Adarsh Gram’ by the respective State Governments.

The vision of an ‘Adarsh Gram'

An ‘Adarsh Gram’ is one wherein people have access to various basic services so that the minimum needs of all the sections of society are fully met and disparities are reduced to a minimum. These villages would have all such infrastructure and their residents will have access to all such basic services that are necessary for a dignified living, creating thereby an environment in which everyone is enabled to utilize her/his potential to the fullest.

Benefits at a glance

Scheme namePradhan Mantri Adarsh Gram Yojana (PMAGY)
Launched byMinistry Of Social Justice and Empowerment
DepartmentDepartment of Social Justice & Empowerment
Launch year2009
Benefit typeIn kind (goods, services or support, not cash)
CategoryAgriculture
Level / StateCentral · All India
Official portalpmagy.gov.in

Key facts

Scheme typeCentral Sector Scheme
Scheme forInfra
Application modeOffline
Last dateNot given in the official listing
AgeNo lower limit to 80 years

Who can apply (quick check)

  • 👤All genders
  • 🎂Age 0 to 80 years
  • 🏘️Rural
  • 📝Offline

Quick check from official data. Full conditions are in the Eligibility section.

What you receive

Holistic Village Development

    • Focuses on Scheduled Caste (SC)-majority villages.
    • Aims to transform them into model villages with access to all basic services.

Financial Support

    • Rs. 20 lakh per village for filling critical gaps in infrastructure and services.

Village Development Plan (VDP)

    • A custom 5-year development plan based on baseline survey and needs.

Convergence of Schemes

    • Integrates multiple central/state schemes like PMAY-G, MGNREGS, Ujjwala, SBM, etc.

Infrastructure Improvements

    • Roads, electricity, sanitation, water, healthcare, schools, Anganwadis, etc.

Social Empowerment

    • Promotes social harmony, inclusion, and awareness among SC communities.

Monitoring Framework

    • Tracks progress across 50+ indicators in education, health, livelihoods, etc.

No Direct Cash Benefit

    • Individuals benefit indirectly through improved village facilities and access to schemes.

Who qualifies

  1. Village must have ≥50% Scheduled Caste (SC) population, but villages with ≥40% SC population may also be included in some states.
  2. The village must be recognized in the latest Census data.
  3. Ideally villages with ≥500 total population.
  4. Villages already covered under PMAGY earlier phases may not be reselected.

Who is not eligible

<br>

Papers to keep ready

0/15 documents ready

Tap a document to mark it as ready. Progress is saved on this device.

Registration walkthrough

Offline

Step 1: Submission of Village Profile and Convergence Committee Details

Format Used: Format-1

The initial step involves submitting comprehensive details of the village, including demographic data and identification of the members of the Convergence Committee responsible for overseeing the implementation of the scheme at the local level.

Step 2: Only for - Assessment and Submission of Infrastructure Requirements and reparation of the Estimated Action Plan

Format Used: Format-2

An assessment is carried out to identify existing infrastructure gaps within the village. The findings are documented and submitted to the relevant authorities to support the preparation of the action plan.

Format Used: Format-4

A detailed action plan is prepared, estimating the scope of work, associated costs, and funding sources, including both convergent and gap-filling interventions.

Step 2: Only for - Household Survey to Identify Individual Needs and Mapping of Schemes to Identified Beneficiaries

Format Used: Format-3A

A door-to-door survey is conducted to assess the specific needs of individual households. This step ensures that interventions are need-based and inclusive.

Format Used: Format-3B

Based on the household survey, a beneficiary-wise mapping is done by linking relevant government schemes and welfare program to each eligible household.

Step 3: Formulation and Approval of Village Development Plan (VDP)

Format Used: VDP Document

The Village Development Plan, encompassing all proposed developmental activities, is finalized and submitted to the District Level Convergence Committee (DLCC) for review and formal approval.

Step 4: Implementation of Development Activities and Progress Reporting

Format Used: Submit Progress Format

Upon approval, implementation of the VDP begins. The district and village-level authorities ensure timely execution of activities and submit progress reports as per the defined monitoring mechanism.

Step 5: Declaration of the Village as “Adarsh Gram”

Criteria: Minimum Score of 70 and Open Defecation Free (ODF) Status

Following successful implementation and fulfilment of identified needs, the village is assessed. If it meets the evaluation criteria, it is officially declared as an “Adarsh Gram” by the competent district authority.

Note -

  1. For the Step 2- User can procedure either one for following plans:
    • Assessment and Submission of Infrastructure Requirements and reparation of the Estimated Action Plan.
    • Household Survey to Identify Individual Needs and Mapping of Schemes to Identified Beneficiaries.
  2. All the formal can be downloaded or accessible from Official document (page 30 onwards).

Important dates

Launch / start06 Jul 2009

Frequently asked questions

What is the objective of the Pradhan Mantri Adarsh Gram Yojana (PMAGY)?

The main objective of PMAGY is the integrated development of Scheduled Caste (SC) majority villages through the convergent implementation of existing schemes and additional support using gap-filling funds for unmet needs.

When was the PMAGY launched and in which states was it initially implemented?

PMAGY was launched in 2009-10 on a pilot basis in 1,000 villages across five states: Tamil Nadu, Rajasthan, Bihar, Himachal Pradesh, and Assam.

What is the eligibility criteria for a village to be selected under PMAGY?

Villages must:

  • Have more than 50% SC population.
  • Have a total population greater than 500. Selection is done in descending order based on the percentage of SC population.

What is the vision of an ‘Adarsh Gram’?

An Adarsh Gram is a model village where all residents have access to basic services like housing, sanitation, health, education, employment, and no caste-based discrimination, enabling them to live a life of dignity.

What kind of financial support is provided under PMAGY?

Each selected village receives Rs. 20 lakh as Central Assistance under PMAGY for gap-filling activities not covered by existing schemes. The balance amount of Rs. 1 lakh per village would be for administrative and other expenses

What are the key focus areas of development under PMAGY?

Development under PMAGY focuses on:

  • Physical infrastructure (roads, electricity, water)
  • Sanitation & environment
  • Social infrastructure and human development
  • Livelihood and skill development
  • Social harmony and dignity

Are only Central Government schemes used for development under PMAGY?

No. PMAGY emphasizes convergent implementation of both Central and State/UT Government schemes, along with gap-filling funds to cover uncovered areas.

What is meant by ‘gap-filling’ under PMAGY?

‘Gap-filling’ refers to activities and needs of the village that are not covered under existing schemes. PMAGY provides funds specifically to fulfill these unmet needs.

What are the benefits to residents of a PMAGY village?

Residents benefit from:

  • All-weather roads, safe drinking water, electricity
  • Sanitary living conditions and solid waste management
  • Functional schools, Anganwadi centers, health centers
  • Skill training, employment opportunities, and social equality

How does PMAGY promote social harmony and inclusion?

The scheme works to eliminate untouchability, caste-based discrimination, and promotes dignity, equal rights, and active community participation through institutions like Gram Sabha, Mahila Mandals, and Youth Clubs.

Share on WhatsAppHelp others find this schemeTelegramFacebookX

tsmpb.in is not affiliated with any government department. Apply only on the official portal and never pay anyone for an application.

The details on this page are from the official listing and have not been rewritten or reviewed by our team yet. Confirm them on the official portal before applying.